Detailed Programme
09:15 - 09:30
Registration and Welcome Coffee
08:30 - 09:00
09:15 - 09:30
Official Opening
09:00 – 09:15
09:15 - 09:30
Product / Equipment Innovation of the Year (5 Finalists)
09:15 – 10:00
Finalists
AI-powered High-precision Robot for Installing Arc-shaped Bottom Box Culverts in Shield Tunnels
China
TBM integrated sensing equipment
China
The Cube System – an Ultra Low Headroom Diaphragm Wall Machine
Belgium
TPC Group Server, Drive Map and Tunnelytics
Germany
Use of Precast Lining and Automated Lining Erector Machine in Mined Tunnels
Australia
09:15 - 09:30
Technical Innovation of the Year (4 Finalists)
10:00 – 10:40
Finalists
A World-First TBM-Excavated Spiral Ramp in Hard Granite for Radioactive Waste Disposal
China
Automated Primary Supports for Tunneling Under Tectonic Stresses and Severe Squeezing: Design and Implementation at Terzo Valico dei Giovi
Italy
Complete Equipment and Construction Technology for Vertical Excavation of Ultra-Large-Diameter Prefabricated Shafts
China
Key Technologies for Shield Cutting and Crossing Reinforced Concrete Diaphragm Walls of Operating Subway Stations
China
09:15 - 09:30
Coffee Break and Project Spotlights
10:40 – 11:20
09:15 - 09:30
Project of the Year up to EUR 100 million (4 Finalists)
11:20 – 12:00
Finalists
Design and build of Lisbon Metropolitan Underground extension - Circular Line Lot 1 between Rato Station and Santos Station
Portugal
Design and Construction of the Lisbon Metro Circular Line Extension – Lot 2 (Santos–Cais do Sodré)
Portugal
Novaliches - Balara Aqueduct 4 (NBAQ4)
Philippines
OLLACHEA TUNNEL
Peru
09:15 - 09:30
Rehabilitation, Upgrading and Re-purposing Project of the Year (3 Finalists)
12:00 - 12:30
Finalists
Howard Street Tunnel
United States of America
The Beverentunnel renovation: where technology meets ecology and tunnel safety
Belgium
Total renovation of the 50-year-old Kennedy Railway Tunnel in Antwerp as part of combined road and railway tunnel
Belgium
09:15 - 09:30
Networking Lunch and Project Spotlights
12:30 – 14:00
09:15 - 09:30
Elevated Thinking: Underground - Shaping the Future (3 Finalists)
14:00 – 14:30
Finalists
Elevating Energy Viability: Sustainable LPG Storage in Engineered Rock Caverns
India
HIPOGEO SANTIAGO BERNABEU STADIUM
Spain
Planning and Construction of the "#" Shaped Underground Road System in Shanghai CBD Core Area
China
09:15 - 09:30
Project of the Year EUR 100-500 million (3 Finalists)
14:30– 15:00
Finalists
Inter-Terminal Bored Tunnels (ITBT) – Changi Airport, Singapore
Singapore
Monsanto-Santa Apolónia Tunnel from Lisbon Drainage Master Plan - "Invisible" works to protect the city against floods - a sustainability project
Portugal
Relocation of Sha Tin Sewage Treatment Works to Caverns - Main Caverns Construction
Hong Kong, China
09:15 - 09:30
Coffee Break and Project Spotlights
15:10 – 15:40
09:15 - 09:30
Major Project of the Year over EUR 500 million (4 Finalists)
15:40 – 16:20
Finalists
Beijing East Sixth Ring Road Tunnel
China
GTX-A Metropolitan Express Railway Deep Tunnel Project between Unjeong–Samsung station in South Korea
South Korea
HS2 MWCC C1 Chiltern Tunnels and Shafts
United Kingdom
Riyadh Metro Lines 1 & 2: Underground Backbone of the World's Longest Driverless Metro
Saudi Arabia
09:15 - 09:30
Young Tunneller of the Year (3 Finalists)
16:20 – 16:50
Finalists
Gabriel Lehmann
Germany
Wojciech Mleczko
Poland
Xu chen
China
09:15 - 09:30
ITA Fellows Recognition
16:50 – 17:05
09:15 - 09:30
Final Project Spotlights
17:05 – 17:35
09:15 - 09:30
Conference Closing
17:35 – 17:45
09:15 - 09:30
Welcome Cocktail
18:30
09:15 - 09:30
Awards Ceremony and Gala Dinner - Portuguese Cultural Programme
19:30
09:15 - 09:30
Closing Programme
20:30
09:15 - 09:30
Secretariat Opening
08:15
09:15 - 09:30
Opening Session
09:00 - 09:50
09:20 - 09:50
Opening Conference
- António Topa Gomes
Vice-Rector of the University of Porto
09:15 - 09:30
Sustainable criteria in long tunnel design. Tunnels for HS Trains
09:50 - 11:15
9:50 - 10:20
Italian HS Rail system focusing on tunnelling stretches
- Andrea Pigorini
President of ITA
10:20 - 10:40
The Europe-Africa Fixed Link Project: Recent Studies and Developments
- Iago Barreiro Tacón; Hannanne Bounjoum
SECEGSA; SNED
10:40 - 11:00
Recent developments for carbon footprint reduction in the design and construction of sustainable tunnels lining
- Benoit De Rivaz
BEKAERT
11:00 - 11:15
Discussion
09:15 - 09:30
Coffee Break
11:15 - 11:35
09:15 - 09:30
The Contribution of Tunneling on the Energy Transition
11:35 - 13:00
11:35 -11:55
The Lisbon Metro Circular Line: Engineering Challenges in an Urban Environment
- Luís Miranda
LNEC
11:55 -12:15
Hydro Pumping-storage
- Paula Sá Pina
EDP
12:15 -12:35
Porto Subway Underground Space
- Pedro Quintas; Jorge Quelhas
Metro do Porto
12:35 -12:55
Tâmega Hydropower System Gigabattery – pumped-storage complex
- Luís Capinha
Iberdrola
12:55 - 13:10
Discussion
09:15 - 09:30
Lunch
13:10 - 14:30
09:15 - 09:30
Solutions for People & Innovations
14:30 - 16:15
14:30 - 15:00
Tunnels for People
- UTF Board Representatives
EUTF
15:00 - 15:20
An Immersed Tunnel as a Reliable Solution for Crossing a Waterway
- Peter van Westendorp
EUTF
15:20 - 15:40
Marão Tunnel: 10 years connecting destinations. Challenges of its conception, construction, and operation
- Bernardo Monteiro; André Oliveira
Infraestruturas de Portugal
15:40 - 16:00
From Information Management to Engineering Intelligence: How BIM enables AI-assisted Decision Making
- Rita Sanfilippo
Lombardi Group
16:00 - 16:15
Discussion
09:15 - 09:30
Coffee Break
16:15 - 16:45
09:15 - 09:30
Tunnel Security, Safety and Integrity
16:45 - 18:00
16:45 - 17:05
Safety in Operation
- Dirceu Santos
Action Modulers
17:05 - 17:25
Motorway Tunnel Management: The Brisa Experience Towards Smarter and Safer Infrastructure
- Carlos Canha
BRISA
17:25 - 17:45
Underground Spaces for Society
- Jenny Yan
ITA Past President And China Railway Academy
17:45 - 18:00
Discussion
09:15 - 09:30
Closing Ceremony - Introducing CPT Anniversary - Words from CPT direction
18:00 - 18:05
09:15 - 09:30
CPT Anniversary
18:05 - 19:10
The Future of CPT
- Round Table Animated by CPTym with the Cooperation of Michel Deffayet, Foreigner YM and Portuguese Tunnel Stakeholders
18:05 - 18:10
Video with CPT history
18:10 - 18:20
Michel Deffayet - ITACET
18:20 - 19:10
Round table organized by CPT ym
09:15 - 09:30
Welcome Drink
19:10 - 20:30
09:15 - 09:30
Dinner at SUD HALL - Tributes to people who contributed to CPT
20:30 - 22:30
09:15 - 09:30
Technical Visit 1 – (Metro de Lisboa) Beneath Lisbon: a metro construction tour from Estrela to the river
09:30 - 12:00
Discover Lisbon from a different perspective: below the streets, where a major metro expansion is taking shape beneath one of the city’s most inviting neighbourhoods.
The visit begins at Estrela Station, close to the gardens of Jardim da Estrela and the striking Basilica da Estrela. From there, participants will explore the construction site of the new metro line, part of a major investment that will add the Estrela and Santos stations and create a new Circular Line in central Lisbon. The project includes approximately 1.9 kilometres of underground infrastructure, designed to improve the network’s capacity, resilience and connections.
Guided by Metropolitano de Lisboa, visitors will descend to the future Santos Station, 54 metres below ground, then walk through the tunnel towards Cais do Sodré, passing through Santos along the way. Emerging near Lisbon’s riverside, the route connects an extraordinary engineering experience with the lively Santos district and the waterfront around Cais do Sodré.
Along the way, discover what it takes to build a metro deep beneath a historic city: the engineering, logistics and operational challenges that remain hidden from view in everyday life. The result is a rare chance to experience Lisbon both as a visitor and from beneath its streets — combining the city’s neighbourhoods and riverside atmosphere with a first-hand look at the infrastructure shaping its future.
Maximum 25 people
Minimum 10 people
Start: 9:45 - concentration at the site entry Rua de São Bernardo (here)
End: 12:00 - new western entrance to Cais do Sodré Station, on the riverside, at Rua da Cintura do Porto de Lisboa (here) , near Titanic Sur Mer
(if possible, bring Personal Protective Equipment)
09:15 - 09:30
Technical Visit 2 – (Metro do Porto) The Ruby Line: discover Porto, Gaia and the Douro
Departure from Lisbon 08:00
A new way to cross the Douro is on its way — and with it, a new way to explore Porto and Vila Nova de Gaia. Stroll through Porto’s historic streets, admire the tiled façades and make your way down to the riverside Ribeira. Then cross the river to Gaia, where the historic Port wine cellars invite you to discover how the region’s famous fortified wine is aged — and, of course, to enjoy a tasting.
The future Ruby (H) line of Metro do Porto will connect Casa da Música in Porto with Santo Ovídio in Gaia, bringing the two cities closer together. Stretching for more than six kilometres, it will have eight stations: Casa da Música, Campo Alegre, Arrábida, Candal, Rotunda, Devesas, Soares dos Reis and Santo Ovídio.
Arrábida, Candal and Rotunda — which will include parking for 500 vehicles — will be above ground. The other five stations will be underground, built using the cut-and-cover method. At Devesas, passengers will be able to connect with the railway line that connect Porto to Lisbon; Santo Ovídio is planned to connect with future high-speed rail services.
One of the project’s highlights will be a new bridge across the Douro, between the Massarelos and Campo Alegre area and Arrábida. Rising 70 metres above the river and stretching 835 metres, it will be named Ponte da D. Antónia Ferreira, a Ferreirinha, or simply Ponte Ferreirinha. The name honours Dona Antónia Ferreira, a remarkable 19th-century Portuguese businesswoman whose work was closely tied to the Port wine trade.
The project also includes two tunnels. Construction began in early 2024, following the award of the contract to a consortium formed by Alberto Couto Alves (ACA), FCC Construcción and Contratas y Ventas. The line is scheduled for completion in August 2028.
With an investment of €622 million, funded by Portugal’s Recovery and Resilience Plan, Environmental Fund and State Budget, the Ruby Line will make it easier to experience both sides of the Douro. Come for the new bridge; stay for Porto’s riverside charm, Gaia’s Port wine cellars and the stories that make this city break unforgettable.
Maximum 50 people (2 groups)
Minimum 20 people
Departure from Lisbon: 8:00 a.m
(if possible, bring Personal Protective Equipment)
09:15 - 09:30
Technical Visit 3 – (Plano Geral de Drenagem de Lisboa (PGDL)) Beneath Lisbon: discover the city’s plan for a more resilient future
09:00 - 13:00
Lisbon’s hillsides and riverfront are part of its charm. They also make managing heavy rainfall a major challenge. The Lisbon Drainage Master Plan (PGDL) is creating new underground routes to help protect the city from flooding — and a visit to its construction works offers a rare look at how this essential infrastructure is built beneath the streets.
The visit includes the Anti-polution Basin at Campolide and Monsanto–Santa Apolónia tunnel, with an internal diameter of 5.5 metres and five kilometres. Visitors can learn how a giant tunnel boring machine, or TBM, excavates through the ground. Built by CREG-WIRTH, the EPB machine has a cutting diameter of 6,410 millimetres and is named H2Oli. The connection to the river will be visited at Santa Apolonia site works.
The PGDL’s benefits extend beyond drainage. Alongside helping to reduce flood risk, the plan promotes the reuse of treated wastewater, helping to close the urban water cycle.
From the green slopes of Monsanto to the historic riverfront at Santa Apolónia, this visit reveals another side of Lisbon: the engineering beneath its landmarks and the work helping the city adapt for the future. It´s a unique opportunity to walk inside the tunnel that keeps Lisbon dry.
The visit will focus on the infrastructure associated with the Santa Apolónia tunnel.
Maximum 40 people
Minimum 20 people
Start: 9:00 - Campolide site
End: 13:00 - same place, Campolide site
(if possible, bring Personal Protective Equipment: helmet and safety boots)